How the DCPL applies
Applying DCPL to first supplies
The Defective Concrete Products Levy (DCPL) applies to a first
supply made on, or after, 1 September 2023 of concrete products
within the sco...
You need to be logged in to the system to access this content, via the log in link at the top of this page. If
you do not have an account, then please read the Help page
for information on how to obtain access.