How the DCPL applies
When does a first supply arise?
The Defective Concrete Products Levy (DCPL) is chargeable on the
first supply of a concrete product within the scope of the levy on,
or after...
You need to be logged in to the system to access this content, via the log in link at the top of this page. If
you do not have an account, then please read the Help page
for information on how to obtain access.