Import Control System 2 (ICS 2)
ICS 2 release schedule
ICS 2 will be released in 3 phases as outlined below.
Release 1 - due 15 March 2021
Goods covered
All postal and express consignments.
Dat...
You need to be logged in to the system to access this content, via the log in link at the top of this page. If
you do not have an account, then please read the Help page
for information on how to obtain access.